Volume 5

REFERENCE MATERIAL FROM PROJECT NO. 11858: TECHNICAL APPENDIX TO EXHIBIT E

Part 1

  • Conceptual-Level Hydrology Study
  • Lake Elsinore Recycling Water Project Draft Fifth Quarter Monitoring Report
  • Preliminary Guidelines for a Monitoring and Surveillance Program
  • Hydrology Study for FERC Project No. 11504

Part 2

  • Biological Resource Assessment

Part 3 

  • Cultural Resource Assessment
  • National Visitor Use Monitoring Results Cleveland National Forest
  • Preliminary Geologic Map of the Santa Ana 30’ x 60’ USGS Topographic Quadrangle
  • Preliminary Geologic Map of the Lake Elsinore 7.5-Minute Topographic Quadrangle
  • Geotechnical Feasibility Report
  • Second Stage Geotechnical Evaluation
  • Conceptual-Level Inundation Studies
  • Construction Traffic Analysis
  • White River Powerline Project Environmental Assessment