Volume 12
Hydrology Reports Part 2 & Geotechnical Reports
HYDROLOGY REPORTS PART 2
- Elsinore Valley Municipal Water District Urban Water Management Plan, Final, June, 2016
- Lake Elsinore and Canyon Lake Nutrient TMDL Annual Water Quality Report, Final Report, August, 2015
- Lake Heating, Cooling and Stratification During LEAPS Operation, August, 2006
- Lake Elsinore and Canyon Lake Preliminary Aeration System Report, June, 2004
- Memorandum, March, 2015
- Effects of LEAPS Operation on Lake Elsinore: 3-D Hydrodynamic Modeling
- Lake Elsinore Water Supply
- Lake Elsinore Recycled Water Project – Draft 4th Quarterly Report, September, 2017
- Lake Elsinore Recycled Water Project – Draft Final Report, November, 2004
- Results from the Lake Elsinore Recycled Water Monitoring Project
- Draft Technical Memorandum, Michael Anderson, April, 2015
- Draft Technical Memorandum, Michael Anderson, June, 2015
- Lake Elsinore Water Level Sustainability
GEOTECHNICAL REPORTS
- Technical Memorandum No. 3, Preliminary Evaluation of Faulting and Seismicity, LEAPS, July 18, 2008
- Technical Memorandum No. 2, Geologic Mapping, LEAPS, July 17, 2008
- Technical Memorandum No. 1, Summary Report of Existing Information, Geology, Seismicity and Geotechnical Issues, LEAPS, January 25, 2008
- Memorandum to U.S. Army Corps of Engineers, Input for United States Army Corps of Engineers Section 404 Permit, LEAPS, November 22, 2006
- Technical Memorandum, Comments on Issues Relating to Hydrology as Identified in the DEIS, LEAPS, March 31, 2006
- Technical Memorandum, Comments on Geotechnical Issues as Identified in the DEIS, LEAPS, March 30, 2006
- Technical Memorandum, Comparative Review of Geotechnical Conditions at Three Candidate Powerhouse Sites: Ortega Oaks, Santa Rosa and Evergreen, LEAPS, March 24, 2006
- Phase I Work Plan, Preliminary Geotechnical Investigation, LEAPS, June 10, 2005
- Report on Water-Quality Sampling Events 2004-05 Wet Season, LEAPS, May 31, 2005
- Geotechnical Feasibility Report, LEAPS, August 28, 2003
- Supplemental Report, Conceptual-Level Dike Breach Inundation Study, LEAPS, December 12, 2003
- Supplement No. 1 to Geotechnical Feasibility Report, October 16, 2003
- Conceptual-Level Hydrology Study, LEAPS, August 28, 2003
- Conceptual-Level Inundation Study, LEAPS, August 28, 2003