Power from nature
Cover Letter
Table of Contents
APPENDIX A – RESPONSES:
Study 9a – Updated Habitat Assessment
Study 16 – Bat Habitat Assessment
Study 18 – Vegetation Mapping Plan
Study 19 – Terrestrial Wildlife Movement
Study 25 – Mitigation Lands Assessment
Study 33 – Cultural Resources
Study 34a – Alternative Transmission Alignments
APPENDIX B – STUDY PLANS:
Study 2 – Seismic Hazard Work Plan
Study 3 – Geotechnical Work Plan
Study 4 – Total Nitrogen, Phosphorus, & Cyanotoxin
Study 7 – Water Quality Plan
Study 8 – Aquifer Impact
Study 9b – Threatened & Endangered Species
Study 28 – Fire Study Work Plan
Study 30 – Visual Simulations Work Plan
Study 31 – Traffic Analysis Work Plan
Study 34b – Proposed Transformer Operation
Attachment 1 – Comments Summary Table
Attachment 2 – Comments Received
Table of Contents
1. Supplemental Response of The Nevada Hydro Company
2. The Hydro Company Response to FERC to USFS Study Request
3. Copy of Inadvertently Excluded Study 34b
4. Supplemental Information on Studies 8 and 9
5. USFS Meeting Materials November 1, 2018
6. USFS Meeting Materials August 9, 2018