Volume 3

Reference Material

 

  1. Ch 1 – Final Environmental Impact Statement, January, 2007
  2. Ch 2 – Substation Drawings, September, 2017
  3. Ch 3 – Collaboration Between the Cleveland National Forest and Nevada Hydro, September, 2017
  4. Ch 4 – TE/VS Interconnect Workshop: Public Meeting Regarding the Talega-Escondido/Valley-Serrano 500 kV Interconnect Project
  5. Ch 5 – FINAL Environmental Impact Report/ Environmental Impact Statement and Proposed Land Use Amendment, October, 2008
  6. Ch 6 – A Bulk Energy Storage Resource Case Study – Update with the 2016 LTPP Assumptions, February, 2017
  7. Ch 7 – A Bulk Energy Storage Resource Case Study Updated from 40% to 50% RPS
  8. Ch 8 – A Bulk Energy Storage Resource Case Study with 40% RPS in 2024, February, 2016
  9. Ch 9 – Modeling and Analysis of Value of Advanced Pumped Storage Hydropower in the U.S., January, 2014
  10. Ch 10 – Modeling and Simulation of Advanced Pumped-Storage Hydropower Technologies and their Contributions to the Power System
  11. Ch 11 – 2016-2017 Transmission Plan, March, 2017
  12. Ch 12 – 2015-2016 Transmission Plan, March, 2016
  13. Ch 13 – Formal Section 7 Consultation for the Lake Elsinore Advanced Pumped Storage Project (P-11858), Riverside County, California, March, 2008
  14. Ch 14 – Lake Elsinore Advanced Pumped Storage Project (FERC PM 11858) Talega-Escondido/Valley-Serrano 500 kV Interconnect Project, October, 2007
  15. Ch 15 – Exhibit B – Operational Spreadsheets, September, 2017
  16. Ch 16 – Draft 2016 Environmental Performance Report of California’s Electrical Generation System, July, 2016
  17. Ch 17 – Tower Placement, Data Information Tables and Location Information, September, 2017
  18. Ch 18 – Standard Large Generator Interconnection Agreement (LGIA) Among The Nevada Hydro Company, Inc. and Southern California Edison Company and California Independent System Operator Corporation
  19. Ch 19 – Comments of Southern California Edison Company Regarding Need to Update the 2007 Final Environmental Impact Statement from Project No. P– 11858, July, 2014
  20. Ch 20 – Southern California Edison Company, Docket Nos. ER12-1302-000; California Independent System Operator Corporation, Docket Nos. ER12 1305-000 and Docket Nos. ER12-1312-000 (consolidated), December, 2013
  21. Ch 21 – State Water Resources Control Board, June, 2014
  22. Ch 22 – Economic Benefits Assessment of the LEAPS Project, September, 2006
  23. Ch 23 – Lake Elsinore Advanced Pumped Storage Project FERC Project Number P – 14227, April, 2014
  24. Ch 24 – Variable Speed Units for Pumped Storage Power Plants, K. Scherer, 2004
  25. Ch 25 – Modern Designs for Pump-Turbines Variable Speed Machines, May, 2003