Volume 3
Reference Material
- Ch 1 – Final Environmental Impact Statement, January, 2007
- Ch 2 – Substation Drawings, September, 2017
- Ch 3 – Collaboration Between the Cleveland National Forest and Nevada Hydro, September, 2017
- Ch 4 – TE/VS Interconnect Workshop: Public Meeting Regarding the Talega-Escondido/Valley-Serrano 500 kV Interconnect Project
- Ch 5 – FINAL Environmental Impact Report/ Environmental Impact Statement and Proposed Land Use Amendment, October, 2008
- Ch 6 – A Bulk Energy Storage Resource Case Study – Update with the 2016 LTPP Assumptions, February, 2017
- Ch 7 – A Bulk Energy Storage Resource Case Study Updated from 40% to 50% RPS
- Ch 8 – A Bulk Energy Storage Resource Case Study with 40% RPS in 2024, February, 2016
- Ch 9 – Modeling and Analysis of Value of Advanced Pumped Storage Hydropower in the U.S., January, 2014
- Ch 10 – Modeling and Simulation of Advanced Pumped-Storage Hydropower Technologies and their Contributions to the Power System
- Ch 11 – 2016-2017 Transmission Plan, March, 2017
- Ch 12 – 2015-2016 Transmission Plan, March, 2016
- Ch 13 – Formal Section 7 Consultation for the Lake Elsinore Advanced Pumped Storage Project (P-11858), Riverside County, California, March, 2008
- Ch 14 – Lake Elsinore Advanced Pumped Storage Project (FERC PM 11858) Talega-Escondido/Valley-Serrano 500 kV Interconnect Project, October, 2007
- Ch 15 – Exhibit B – Operational Spreadsheets, September, 2017
- Ch 16 – Draft 2016 Environmental Performance Report of California’s Electrical Generation System, July, 2016
- Ch 17 – Tower Placement, Data Information Tables and Location Information, September, 2017
- Ch 18 – Standard Large Generator Interconnection Agreement (LGIA) Among The Nevada Hydro Company, Inc. and Southern California Edison Company and California Independent System Operator Corporation
- Ch 19 – Comments of Southern California Edison Company Regarding Need to Update the 2007 Final Environmental Impact Statement from Project No. P– 11858, July, 2014
- Ch 20 – Southern California Edison Company, Docket Nos. ER12-1302-000; California Independent System Operator Corporation, Docket Nos. ER12 1305-000 and Docket Nos. ER12-1312-000 (consolidated), December, 2013
- Ch 21 – State Water Resources Control Board, June, 2014
- Ch 22 – Economic Benefits Assessment of the LEAPS Project, September, 2006
- Ch 23 – Lake Elsinore Advanced Pumped Storage Project FERC Project Number P – 14227, April, 2014
- Ch 24 – Variable Speed Units for Pumped Storage Power Plants, K. Scherer, 2004
- Ch 25 – Modern Designs for Pump-Turbines Variable Speed Machines, May, 2003